CTC Marine Projects Tees Offshore Base

banner

Tees Offshore Base

Teesside Offshore Base (TOB) is CTC’s large-scale UK Marine Base, servicing internal requirements and third party work. It has an experienced workforce and successful track record in conducting major operations, including vessel and equipment mobilisations and demobilisations based on the ‘Just in Time’ principle, pipe spooling and other heavy construction projects.

The site offers operational and port services and is within easy access of all major arterial road networks, with Durham Tees Valley airport twenty minutes away by road.

The facility has full service sector support in the local area including engineering, freight forwarding, lifting, testing and service infrastructure, whilst it is also located next to CTC’s long-term leased area, the ‘Heavy Lift Quay’ (HLQ). The HLQ provides an array of first-class facilities including a 200te capacity crane with associated ground loading capability on the quayside and a ‘deep water berth’, maintained at over 8 metres Lowest Astronomical Tide (LAT).

Download overview sheet

CTC holds a full suite of Quality accreditations, including but not limited to; ISO 9001:2008, ISO 14001:2004 and ISO 18001:2007


Services include:

  • Ideal location for North Sea access
  • Heavy Lift Quay
  • 200te capacity crane
  • 8 metre Lowest Astronomical Tide (LAT) deep water berth
  • 24/7 operations
  • Within easy access of all major arterial road networks
banner

PROVIDING AN ARRAY OF FIRST-CLASS FACILITIES